Filer 2009 WWTP Improvements 
New WWTP including influent lift station, screening, biological treatment, membrane bioreactors (MBR), UV disinfection, biosolids and dewatering, laboratory, site work, and related items.  
Location:  
Cost: $ 10,013,335 
Owner: City of Filer, Idaho 
Designer: J.U.B. Engineers 
Construction Period: 04/2010 - 08/2011 
 
2011-04-18T11:15:44-06:00 
Image 

NW Interceptor Portion B Paradise Lift Station 
Construction of Paradise Lift Station in Chubbuck, ID including structural, concrete, and plumbing.  
Location: Chubbuck, ID 
Cost: $ $1,566,126 
Owner: City of Chubbuck 
Designer: J.U.B. Engineers 
Construction Period: 04/2010 - 11/2011 
 
2011-04-18T10:50:16-06:00 
Image 

Post Falls Wastewater Treatment Plant Improvements  
Addition of fine screen, grit chamber, and odor control to the existing headworks. Construction of biological nutrient removal, oxidation ditches No. 5 and No. 6, clarifiers No. 6 and No. 7. Expansion of existing dewatering building with an additional belt filter press. Provide all appurtenant piping, pumps, electrical, and site modification. 
Location: Post Falls, ID 
Cost: $ 11,246,306 
Owner: City of Post Falls 
Designer: J.U.B. Engineers 
Construction Period: 03/2009 - 07/2010 
 
2011-04-18T10:27:35-06:00 
Image 

Jackpot Wastewater Treatment Plant Modifications 
Modifications to increase WWTP capacity, utilizing pretreatment and aeration with patented submergible aerated bio-film reactors, also includes new headworks building, mechanical screen and blower.  
Location: Jackpot, NV 
Cost: $ 1,565,000 
Owner: Board of County Commissioners Elko County 
Designer: Stantec 
Construction Period: 02/2010 - 09/2010 
 
2010-04-27T08:43:23-06:00 
Image 

EIRWWA Oxbow WWTP 
Civil, architectural, structural, mechanical, electrical, and instrumentation work for the Eastern Idaho Regional Wastewater Authority (EIRWWA) Oxbow wastewater treatment plant. New structures include coarse and fine screenings facilities, grit removal facility, primary lift station, membrane bioreactor equipment and basins, process and scour air blower facilities, non potable water booster pump station, reuse pump station wet well, solids handling building, maintenance shop, and administration building.  
Location: Shelley, ID 
Cost: $ 20,579,940 
Owner: EIRWWA 
Designer: Forsgren Associates 
Construction Period: 07/2008 - 01/2010 
 
2010-02-10T16:42:14-07:00 
Image 

Wilder Water Treatment Plant 
Construction of influent submersible lift station, 1450lf forcemain, headworks building with mechanical screening, aerated lagoons, chlorine contact chamber with chemical metering pumps and intermittent sand filter.  
Location: Wilder, ID 
Cost: $ 2,021,791 
Owner: City of Wilder 
Designer: Pharmer Engineering 
Construction Period: 06/2009 - 03/2010 
 
2010-02-10T16:29:06-07:00 
Image 

Cole to Broadway Soundwalls 
Construction of precast concrete panel soundwalls to provide sound mitigation from increased traffic and future I-84 construction. Project consisted of three separate segments along the north side of 3.22 miles of I-84 MP 51.3 to MP54.6 Cole Rd to Broadway Ave WB  
Location: Boise, Idaho 
Cost: $ 9,534,742 
Owner: ITD 
Designer: ITD 
Construction Period: 03/2008 - 01/2009 
 
2009-11-30T16:17:17-07:00 
Image 

Deer Flat Dam Outlet Works Rehab 
Excavation into earth embankment dam and emergency berm at the Caldwell outlet works to demo, remove and replace the existing concrete outlet structure. Work included installing sheet pile cut off wall, and new earth embankment section. Constructing, furnishing, and installing of deepwell dewatering system and new electrical supply system for gate operation in outlet works. 
Location: Deer Flat National Wildlife Refuge, Nampa Idaho 
Cost: $ 6,487,408 
Owner: Bureau of Reclamation 
Designer: Basepoint Design Corporation 
Construction Period: 11/2007 - 02/2009 
 
2009-11-09T13:35:28-07:00 
Image 

Arrowrock Dam Outlet Works Rehabilitation 
This project consists of the construction of a new gatehouse structure, control building, access stairway and removal of existing Ensign Valves and installation of new Clamshell Gates. This is a one-of-the kind project that is totally unique. 
Location: Arrowrock Dam, Idaho 
Cost: $ 11,589,551 
Owner: Bureau of Reclamation 
Designer: Bureau of Reclamation 
Construction Period: 09/2001- 04/2004 
 
2009-11-09T13:34:36-07:00 
Image 

Star Wastewater Treatment Plant 
The work includes improvements to the existing wastewater lagoon treatment facility, including a new mechanical wastewater treatment process involving a membrane bioreactor (MBR). This new MBR process includes cast-in-place concrete basins and a blower building to house positive displacement blowers permeate pumps and WAS pumps. The project also includes a new headworks building to screen wash and remove grit and debris from wastewater influent, a new ultraviolet (UV) disinfection facility, and all supporting mechanical piping and electrical systems. 
Location: Star, Idaho 
Cost: $ 3,245,359 
Owner: Star Sewer & Water District 
Designer: Keller Associates 
Construction Period: 2006 
 
2009-11-09T13:33:48-07:00 
Image 

West Boise Wastewater Treatment Facility  
Improvements and modifications to the West Boise WWTF. Project included modifications to the dewatering building and existing piping, new filtrate tanks, site work improvements, yard piping, process instrumentation and control system, power system including MCC and distribution system reroute. 
Location: Boise, Idaho 
Cost: $ 2,704,813 
Owner: City of Boise 
Designer: MWH 
Construction Period: 11/2005 - 08/2006 
 
2009-11-09T13:32:52-07:00 
Image 

McCall Water Storage Tank 
General construction of an 1.1 million gallon earthen covered, concrete treated water storage tank (110 ft diameter x 16 ft. water depth) with a precast concrete cover. The work includes excavation, backfill, structural, yard piping, site grading and seeding. seeding 
Location: McCall, Idaho 
Cost: $ 1,447,672 
Owner: City of McCall 
Designer: Pharmer Engineering 
Construction Period: 08/2005 - 12/2005 
 
2009-11-09T13:31:44-07:00 
Image 

Quigley Canyon Water Storage Tank  
A 2-million gallon, cast in place concrete, earthen covered, treated water storage tank for the City of Hailey, ID. The project includes associated yard piping, overflow structure, precast control building with chlorination system, site grading and seeding. The project also includes approximately 5,800lf of 16” transmission main line leading up to the tank structure. 
Location: Hailey, Idaho 
Cost: $ 2,679,695 
Owner: City of Hailey, Idaho 
Designer: Carollo Engineers 
Construction Period: 06/2006 - 06/2007 
 
2009-11-09T13:30:51-07:00 
Image 

Ketchum WWTF Filter Storage Bldg.  
The work includes various improvements to the existing Wastewater Treatment Facility, including miscellaneous yard piping, site work, one CMU building, process piping, electrical, instrumentation, plumbing, HVAC and installation of owner supplied filter packages (cloth media filters in steel tanks). 
Location: Ketchum, Idaho 
Cost: $ 1,310,866 
Owner: City of Ketchum 
Designer: Pharmer Engineering, LLC 
Construction Period: 05/2006 - 12/2006 
 
2009-11-09T13:29:40-07:00 
Image 

Rail Transfer Facility 
Construction of a new rail transfer facility for US Ecology of Idaho. The project included contractor furnished and installed equipment, HVAC, air distribution systems, pre-engineered metal building, various structural concrete work, electrical, communications, truck scale, and coordination with new railroad spur being provided. 
Location: Grandview, Idaho 
Cost: $ 1,552,046 
Owner: US Ecology of Idaho 
Designer: Case, Lowe and Hart, Inc. 
Construction Period: 12/2005 - 05/2006 
 
2009-11-09T13:28:30-07:00 
Image 

Avimor Water Reclamation Facility 
This project is a design/build mechanical wastewater treatment facility for the Avimor community located on Highway 55 just north of Boise. This is the first design/build filtration wastewater treatment plant in the State of Idaho. The Kubota membranes for this project were furnished through Goble Sampson Associates. The project generally consists of process tanks, a combination headworks/solids building, a process building with generator room, underground chlorine contact chamber, lift station, and various site improvements. 
Location: Avimor Community Ada County, Idaho 
Cost: $ 5,079,982 
Owner: SunCor Idaho, LLC 
Designer: Pharmer Engineering 
Construction Period: 12/2006 - 11/2007 
 
2009-11-09T11:47:20-07:00 
Image 

Eagle State Fish Hatchery  
19,110sf CMU rearing building construction included degassing tower, mechanical, electrical, well water collection improvements, yard piping, paving, and associated site improvements. Project also included extensive water supply piping and installation of both owner supplied and contractor purchased tanks. 
Location: Eagle, Idaho 
Cost: $ 3,297,770 
Owner: Idaho Department of Fish & Game 
Designer: MWH 
Construction Period: 09/2007 - 05/2008