Filer 2009 WWTP Improvements
New WWTP including influent lift station, screening, biological treatment, membrane bioreactors (MBR), UV disinfection, biosolids and dewatering, laboratory, site work, and related items.
Location:
Cost: $ 10,013,335
Owner: City of Filer, Idaho
Designer: J.U.B. Engineers
Construction Period: 04/2010 - 08/2011
2011-04-18T11:15:44-06:00
NW Interceptor Portion B Paradise Lift Station
Construction of Paradise Lift Station in Chubbuck, ID including structural, concrete, and plumbing.
Location: Chubbuck, ID
Cost: $ $1,566,126
Owner: City of Chubbuck
Designer: J.U.B. Engineers
Construction Period: 04/2010 - 11/2011
2011-04-18T10:50:16-06:00
Post Falls Wastewater Treatment Plant Improvements
Addition of fine screen, grit chamber, and odor control to the existing headworks. Construction of biological nutrient removal, oxidation ditches No. 5 and No. 6, clarifiers No. 6 and No. 7. Expansion of existing dewatering building with an additional belt filter press. Provide all appurtenant piping, pumps, electrical, and site modification.
Location: Post Falls, ID
Cost: $ 11,246,306
Owner: City of Post Falls
Designer: J.U.B. Engineers
Construction Period: 03/2009 - 07/2010
2011-04-18T10:27:35-06:00
Jackpot Wastewater Treatment Plant Modifications
Modifications to increase WWTP capacity, utilizing pretreatment and aeration with patented submergible aerated bio-film reactors, also includes new headworks building, mechanical screen and blower.
Location: Jackpot, NV
Cost: $ 1,565,000
Owner: Board of County Commissioners Elko County
Designer: Stantec
Construction Period: 02/2010 - 09/2010
2010-04-27T08:43:23-06:00
EIRWWA Oxbow WWTP
Civil, architectural, structural, mechanical, electrical, and instrumentation work for the Eastern Idaho Regional Wastewater Authority (EIRWWA) Oxbow wastewater treatment plant. New structures include coarse and fine screenings facilities, grit removal facility, primary lift station, membrane bioreactor equipment and basins, process and scour air blower facilities, non potable water booster pump station, reuse pump station wet well, solids handling building, maintenance shop, and administration building.
Location: Shelley, ID
Cost: $ 20,579,940
Owner: EIRWWA
Designer: Forsgren Associates
Construction Period: 07/2008 - 01/2010
2010-02-10T16:42:14-07:00
Wilder Water Treatment Plant
Construction of influent submersible lift station, 1450lf forcemain, headworks building with mechanical screening, aerated lagoons, chlorine contact chamber with chemical metering pumps and intermittent sand filter.
Location: Wilder, ID
Cost: $ 2,021,791
Owner: City of Wilder
Designer: Pharmer Engineering
Construction Period: 06/2009 - 03/2010
2010-02-10T16:29:06-07:00
Cole to Broadway Soundwalls
Construction of precast concrete panel soundwalls to provide sound mitigation from increased traffic and future I-84 construction. Project consisted of three separate segments along the north side of 3.22 miles of I-84 MP 51.3 to MP54.6 Cole Rd to Broadway Ave WB
Location: Boise, Idaho
Cost: $ 9,534,742
Owner: ITD
Designer: ITD
Construction Period: 03/2008 - 01/2009
2009-11-30T16:17:17-07:00
Deer Flat Dam Outlet Works Rehab
Excavation into earth embankment dam and emergency berm at the Caldwell outlet works to demo, remove and replace the existing concrete outlet structure. Work included installing sheet pile cut off wall, and new earth embankment section. Constructing, furnishing, and installing of deepwell dewatering system and new electrical supply system for gate operation in outlet works.
Location: Deer Flat National Wildlife Refuge, Nampa Idaho
Cost: $ 6,487,408
Owner: Bureau of Reclamation
Designer: Basepoint Design Corporation
Construction Period: 11/2007 - 02/2009
2009-11-09T13:35:28-07:00
Arrowrock Dam Outlet Works Rehabilitation
This project consists of the construction of a new gatehouse structure, control building, access stairway and removal of existing Ensign Valves and installation of new Clamshell Gates. This is a one-of-the kind project that is totally unique.
Location: Arrowrock Dam, Idaho
Cost: $ 11,589,551
Owner: Bureau of Reclamation
Designer: Bureau of Reclamation
Construction Period: 09/2001- 04/2004
2009-11-09T13:34:36-07:00
Star Wastewater Treatment Plant
The work includes improvements to the existing wastewater lagoon treatment facility, including a new mechanical wastewater treatment process involving a membrane bioreactor (MBR). This new MBR process includes cast-in-place concrete basins and a blower building to house positive displacement blowers permeate pumps and WAS pumps. The project also includes a new headworks building to screen wash and remove grit and debris from wastewater influent, a new ultraviolet (UV) disinfection facility, and all supporting mechanical piping and electrical systems.
Location: Star, Idaho
Cost: $ 3,245,359
Owner: Star Sewer & Water District
Designer: Keller Associates
Construction Period: 2006
2009-11-09T13:33:48-07:00
West Boise Wastewater Treatment Facility
Improvements and modifications to the West Boise WWTF. Project included modifications to the dewatering building and existing piping, new filtrate tanks, site work improvements, yard piping, process instrumentation and control system, power system including MCC and distribution system reroute.
Location: Boise, Idaho
Cost: $ 2,704,813
Owner: City of Boise
Designer: MWH
Construction Period: 11/2005 - 08/2006
2009-11-09T13:32:52-07:00
McCall Water Storage Tank
General construction of an 1.1 million gallon earthen covered, concrete treated water storage tank (110 ft diameter x 16 ft. water depth) with a precast concrete cover. The work includes excavation, backfill, structural, yard piping, site grading and seeding. seeding
Location: McCall, Idaho
Cost: $ 1,447,672
Owner: City of McCall
Designer: Pharmer Engineering
Construction Period: 08/2005 - 12/2005
2009-11-09T13:31:44-07:00
Quigley Canyon Water Storage Tank
A 2-million gallon, cast in place concrete, earthen covered, treated water storage tank for the City of Hailey, ID. The project includes associated yard piping, overflow structure, precast control building with chlorination system, site grading and seeding. The project also includes approximately 5,800lf of 16” transmission main line leading up to the tank structure.
Location: Hailey, Idaho
Cost: $ 2,679,695
Owner: City of Hailey, Idaho
Designer: Carollo Engineers
Construction Period: 06/2006 - 06/2007
2009-11-09T13:30:51-07:00
Ketchum WWTF Filter Storage Bldg.
The work includes various improvements to the existing Wastewater Treatment Facility, including miscellaneous yard piping, site work, one CMU building, process piping, electrical, instrumentation, plumbing, HVAC and installation of owner supplied filter packages (cloth media filters in steel tanks).
Location: Ketchum, Idaho
Cost: $ 1,310,866
Owner: City of Ketchum
Designer: Pharmer Engineering, LLC
Construction Period: 05/2006 - 12/2006
2009-11-09T13:29:40-07:00
Rail Transfer Facility
Construction of a new rail transfer facility for US Ecology of Idaho. The project included contractor furnished and installed equipment, HVAC, air distribution systems, pre-engineered metal building, various structural concrete work, electrical, communications, truck scale, and coordination with new railroad spur being provided.
Location: Grandview, Idaho
Cost: $ 1,552,046
Owner: US Ecology of Idaho
Designer: Case, Lowe and Hart, Inc.
Construction Period: 12/2005 - 05/2006
2009-11-09T13:28:30-07:00
Avimor Water Reclamation Facility
This project is a design/build mechanical wastewater treatment facility for the Avimor community located on Highway 55 just north of Boise. This is the first design/build filtration wastewater treatment plant in the State of Idaho. The Kubota membranes for this project were furnished through Goble Sampson Associates. The project generally consists of process tanks, a combination headworks/solids building, a process building with generator room, underground chlorine contact chamber, lift station, and various site improvements.
Location: Avimor Community Ada County, Idaho
Cost: $ 5,079,982
Owner: SunCor Idaho, LLC
Designer: Pharmer Engineering
Construction Period: 12/2006 - 11/2007
2009-11-09T11:47:20-07:00
Eagle State Fish Hatchery
19,110sf CMU rearing building construction included degassing tower, mechanical, electrical, well water collection improvements, yard piping, paving, and associated site improvements. Project also included extensive water supply piping and installation of both owner supplied and contractor purchased tanks.
Location: Eagle, Idaho
Cost: $ 3,297,770
Owner: Idaho Department of Fish & Game
Designer: MWH
Construction Period: 09/2007 - 05/2008
|
|
|
|
|
|