Fort Peck Water Treatment Plant
New treatment plant process building which houses 8 cast in place concrete filter boxes, a single-level chemical feed and storage area, electrical load center, operations & administration and garage/shop maintenance area.
Location: Wolf Point, MT
Cost: $ $26,615,949
Owner: Fort Peck Assiniboine and Sioux Tribes
Designer: Morrison-Maierle Inc.
Construction Period: 06/2009 - 08/2011
2010-04-27T14:48:08-06:00
Land Port of Entry Portal, ND
Completion of the construction of the Main Port Building facility and construction of four Auxiliary Buildings, that support the border crossing and sitework construction
Location: Portal, ND
Cost: $ 16,797,471
Owner: GSA
Designer: CTA
Construction Period: 11/2010 - 07/2012
2009-11-09T14:03:37-07:00
Minidoka Dam Modifications
Construction of a new South Gated spillway, new North and South (RCC) dikes, new South and North Side Canal headworks, North and South RCC overflow spillways, and modifications to the North Gated spillway.
Location: Minidoka Project, Idaho
Cost: $ 23,622,560
Owner: Bureau of Reclamation
Designer:
Construction Period: 09/2011 - 03/2015
2009-11-09T14:02:43-07:00
Design-Build Land Port of Entry Santa Teresa, NM
Design and construction LEED Gold Certified Primary Pedestrian Inspection addition to the Main Building, an Inbound Non-Commercial Secondary Inspection Building, High Mast Lighting, a new 8 Dog Kennel, a new Export Dock, two additional Inbound Non-Commercial Primary Inspection Booths and one new Inbound Commercial Primary Inspection Booth.
Location: Santa Teresa, NM
Cost: $ 8,694,833
Owner: GSA
Designer: Tetra Tec EC
Construction Period: 09/2010 - 10/2012
2009-11-09T14:01:42-07:00
Devils Lake Flood Risk Management Phase 2B Embankments
Excavation, placement of new impervious embankment fill & sand drain, riprap slope protection and pump station construction.
Location: Devils Lake, ND
Cost: $ 41,917,094
Owner: USACE St. Paul District
Designer: USACE St. Paul District
Construction Period: 06/2011 - 12/2012
2009-11-09T14:00:24-07:00
ADAL Missile Service Complex, FE Warren AFB, WY
Design and construction of ADAL to existing Missile Service Complex (MSC) Bldg 1235, new Proof Load Test Pit (PLPT) facility, and demolition and removal of existing PLTP facility.
Location: FE Warren AFB, WY
Cost: $ 4,943,570
Owner: USACE - Omaha District
Designer: Tetra Tech
Construction Period: 04/2010 - 09/2011
2009-11-09T13:59:17-07:00
SH-21 Mores Creek Bridge, Ada Co, ID
Project includes, rehabilitation of pier 4 footing (including pressure grouting and rock armoring), installing seismic restrainers and bearing cap extension, painting of steel truss superstructure, expansion joint repairs, bridge railing replacement, bridge deck rehab, & guardrail installation.
Location: Ada County, ID
Cost: $ 2,787,682
Owner: Idaho Department of Transportation
Designer: HDR
Construction Period: 10/2010 - 06/2011
2009-11-09T13:55:00-07:00
FY10 Missile Procedure Training Operations Facility
Design and construction of Missile Procedure Training Facility
Location: Minot, North Dakota
Cost: $ 8,929,611
Owner: USACE Omaha District
Designer: Tetra Tech
Construction Period: 01-2010 - 06/2011
|
|
|
|
|
|