2010-04-27T14:59:56-06:00 
Image 

Fort Peck Water Treatment Plant  
New treatment plant process building which houses 8 cast in place concrete filter boxes, a single-level chemical feed and storage area, electrical load center, operations & administration and garage/shop maintenance area. 
Location: Wolf Point, MT 
Cost: $ $26,615,949 
Owner: Fort Peck Assiniboine and Sioux Tribes 
Designer: Morrison-Maierle Inc. 
Construction Period: 06/2009 - 08/2011 
 
2010-04-27T14:48:08-06:00 
Image 

Land Port of Entry Portal, ND 
Completion of the construction of the Main Port Building facility and construction of four Auxiliary Buildings, that support the border crossing and sitework construction  
Location: Portal, ND 
Cost: $ 16,797,471 
Owner: GSA 
Designer: CTA 
Construction Period: 11/2010 - 07/2012 
 
2009-11-09T14:03:37-07:00 
Image 

Minidoka Dam Modifications 
Construction of a new South Gated spillway, new North and South (RCC) dikes, new South and North Side Canal headworks, North and South RCC overflow spillways, and modifications to the North Gated spillway. 
Location: Minidoka Project, Idaho 
Cost: $ 23,622,560 
Owner: Bureau of Reclamation 
Designer:  
Construction Period: 09/2011 - 03/2015 
 
2009-11-09T14:02:43-07:00 
Image 

Design-Build Land Port of Entry Santa Teresa, NM 
Design and construction LEED Gold Certified Primary Pedestrian Inspection addition to the Main Building, an Inbound Non-Commercial Secondary Inspection Building, High Mast Lighting, a new 8 Dog Kennel, a new Export Dock, two additional Inbound Non-Commercial Primary Inspection Booths and one new Inbound Commercial Primary Inspection Booth.  
Location: Santa Teresa, NM 
Cost: $ 8,694,833 
Owner: GSA 
Designer: Tetra Tec EC 
Construction Period: 09/2010 - 10/2012 
 
2009-11-09T14:01:42-07:00 
Image 

Devils Lake Flood Risk Management Phase 2B Embankments 
Excavation, placement of new impervious embankment fill & sand drain, riprap slope protection and pump station construction. 
Location: Devils Lake, ND 
Cost: $ 41,917,094 
Owner: USACE St. Paul District 
Designer: USACE St. Paul District 
Construction Period: 06/2011 - 12/2012 
 
2009-11-09T14:00:24-07:00 
Image 

ADAL Missile Service Complex, FE Warren AFB, WY 
Design and construction of ADAL to existing Missile Service Complex (MSC) Bldg 1235, new Proof Load Test Pit (PLPT) facility, and demolition and removal of existing PLTP facility.  
Location: FE Warren AFB, WY 
Cost: $ 4,943,570 
Owner: USACE - Omaha District 
Designer: Tetra Tech 
Construction Period: 04/2010 - 09/2011 
 
2009-11-09T13:59:17-07:00 
Image 

SH-21 Mores Creek Bridge, Ada Co, ID 
Project includes, rehabilitation of pier 4 footing (including pressure grouting and rock armoring), installing seismic restrainers and bearing cap extension, painting of steel truss superstructure, expansion joint repairs, bridge railing replacement, bridge deck rehab, & guardrail installation.  
Location: Ada County, ID 
Cost: $ 2,787,682 
Owner: Idaho Department of Transportation 
Designer: HDR 
Construction Period: 10/2010 - 06/2011 
 
2009-11-09T13:55:00-07:00 
Image 

FY10 Missile Procedure Training Operations Facility 
Design and construction of Missile Procedure Training Facility 
Location: Minot, North Dakota 
Cost: $ 8,929,611 
Owner: USACE Omaha District 
Designer: Tetra Tech 
Construction Period: 01-2010 - 06/2011