Fort Peck Water Treatment Plant

Construct new treatment plant process building which houses 8 cast-in-place concrete filter boxes, a single-level chemical feed and storage area, electrical load center, operations & administration area, garage/shop maintenance area, 30-foot deep drain pump station, along with associated access roads, sitework, landscaping, irrigation water system, potable water system, sanitary sewer system, equipment installation, plumbing, instrumentation & controls, heating & ventilation, and electrical.

Location: Wolf Point, MT
Cost: $ 27,287,000
Owner: Fort Peck Assiniboine and Sioux Tribes
Designer: Morrison-Maierle Inc.
Construction Period: 06/2009 – 12/2011