Replace Moose Wastewater and Address Critical Water Systems

taggart tankConstruct a new 60,000-GPD membrane biological reactor (MBR) activated sludge WWTP includes temporary lift station, new force main and gravity piping and demolish existing WWTP.  Also, construct a new Water Treatment System and  infrastructure including two  wells; a Well House building with electrical and chemical treatment rooms; 300,000 gallon buried concrete water storage tank; install over 20,000-LF of 12-inch and 8-inch water transmission main, electrical, SCADA and fiber conduits; and demolish existing water system infrastructure, well house, tanks and utility vaults.

  • Location: Moose, WY
  • Cost: 12,363,530
  • Owner: National Park Service
  • Designer: National Park Service
  • Construction Period: 09/2016 - 03/2018

Jerome Phase II Wastewater Treatment Improvements

DImprovements to the wastewater treatment plant involving construction of concrete and masonry structures; installation of clarifiers, pumps, mixers, blowers, diffused aeration, sludge thickening and dewatering equipment, anaerobic sludge digestion equipment, chemical feed systems, generator(s), and appurtenant work.

  • Location: Jerome, ID
  • Cost: 24,850,600
  • Owner: City of Jerome
  • Designer: Keller Associates
  • Construction Period: 08/2016 - 11/2018