MarCon Office & Shop

marconnew

Design-Build 20,000sf pre-engineered metal building with office and shop areas, for MarCon Inc., a heavy highway guardrail manufacturing and installation contractor.

  • Location: Meridian, ID
  • Cost: $ 1,983,744
  • Owner: MarCon Inc.
  • Designer: BRS Architects
  • Construction Period: 04/2006-11/2006

 

Meridian Fire Station

meridianFirenew

Construct a 7,000sf two bay fire station and mini-city park  adjacent to stations outdoor  recreation area on a 1.68 acre site.

  • Location: Meridian, ID
  • Cost: $ 1,059,000
  • Owner: Meridian Rural Fire Protection Dist.
  • Designer: ZGA Architects and Planners, Charter
  • Construction Period: 08/2005 – 02/2006

 

Rail Transfer Facility

railTransfer_new

Construct a  pre-engineered metal building rail transfer facility for US Ecology of Idaho, install equipment, HVAC, air distribution systems, various structural concrete work, electrical, communications, truck scale, and coordinate with new railroad spur.

  • Location: Grandview, ID
  • Cost: $ 1,552,000
  • Owner: US Ecology of Idaho
  • Designer: Case, Lowe and Hart, Inc.
  • Construction Period: 12/2005 - 05/2006

 

Double D Home & Ranch

doubleDnew

Construct a 15,000 SF pre-engineered metal building to house a retail farm supply store, equipment rental shop, 4,200 SF C-store and  fuel pumps, all with a western motif.  Site work included a mile long extension of sewer and water mains to the previously unimproved project site.

  • Location: Meridian, ID
  • Cost: $ 2,350,000
  • Owner: Double D
  • Designer: Cole + Poe Architects
  • Construction Period: 10/2004-10/2005

 

Tully’s Coffee

tullysnew

Construct retail pads and tenant improvements for Tulley’s Coffee locations including, Eagle and Ustick Roads, Columbia Village Shopping Center, Eagle River, and Grandview Station.

  • Location: Boise, Meridian, and Eagle, ID
  • Cost: $ 1,830,000
  • Owner: Tulley's Coffee Retail, LLC / Pinnacle Coffee LLC
  • Designer: BRS Architects
  • Construction Period: 06/2006 – 11/2009

 

Old Spaghetti Factory Restaurant

oldSpaghettinew

Shell and tenant improvements to alter an existing 10,584sf historic building in downtown Boise into an Old Spaghetti Factory Restaurant.

  • Location: Boise, ID
  • Cost: $ 1,300,000
  • Owner: Pinnacle Holdings, LLC / OSF
  • Designer: BRS Architects
  • Construction Period: 12/2006-05/2007