Enhanced Training in Idaho Bombing Range

trainingRangenew

Design-Build expansion of Saylor Creek fighter/bomber training range, 43.5 miles of roadway improvement, 52 pre-engineered metal buildings, radar emitter sites, industrial complex, maintenance facility, multi target and revetment disposition, remote job site location requiring man camp facility, aggressive 289 day design-build schedule, environmentally sensitive areas with “no work” constraints during certain dates. (Joint Venture with CH2M HILL)

  • Location: Mountain Home AFB, ID
  • Cost: $ 17,784,000
  • Owner: USACE - Mountain Home AFB
  • Designer: WJA
  • Construction Period: 03/2000 - 12/2001

 

ADAL Fitness Center

rsci mhafb subject b 12_9_05 007

Construct an addition and remodel the interior and exterior of the existing fitness center to deliver a new 82,000sf facility.  This contract also includes a design-build change order to construct a roof overbuild system for the existing gymnasiums and natatorium and add a de-humidification system for the existing natatorium.

  • Location: Mountain Home AFB, ID
  • Cost: $ 9,100,000
  • Owner: USACE - Mountain Home AFB
  • Designer: WJA
  • Construction Period: 03/2004-11/2005

 

Eagle State Fish Hatchery

361EagleFishhatchery

Construct a new incubation and early rearing facility for the Captive Redfish Lake Sockeye Salmon, includes a new 19,110sf rearing building, well water collection improvements, site piping, site paving and civil improvements.

  • Location: Eagle, ID
  • Cost: $ 3,297,000
  • Owner: Idaho Department of Fish & Game
  • Designer: MWH
  • Construction Period: 09/2007 - 05/2008

 

Boise State University Recreational Facility

BSUrecCenternew
Construct athletic facility with indoor elevated structural concrete running track, racquet ball courts, large meeting atrium, and climbing wall, structural concrete and precast building shell with structural steel roof structure.

  • Location: Boise, ID
  • Cost: $ 11,500,000
  • Owner: Boise State University
  • Designer: Design West Architects
  • Construction Period: 04/2000 - 07/2002

 

Boise State University Parking Structure No. 1

bsuParkingnew

Construct a four story parking structure with cast-in-place post tension elevated decks and masonry exterior stair towers and elevator.

  • Location: Boise, ID
  • Cost: $ 3,792,000
  • Owner: Boise State University
  • Designer: CSHQA Architects
  • Construction Period: 08/1999 - 08/2000

 

Boise State University Appleton Tennis Facility

tennisCourt

Demolish existing tennis courts and construct a new tennis complex project includes six (6) tennis courts, central pedestrian area, grandstand raised seating, terraced spectator seating, landscaping and two linear buildings under the grandstand raised seating.

  • Location: Boise, ID
  • Cost: $ 1,942,000
  • Owner: Boise State University
  • Designer: Insight Architects
  • Construction Period: 07/2001 - 04/2002

 

 

Design-Build ADAL Missile Service Complex

Site visit 032cropped

Design-Build LEED Silver certified addition to the existing Missile Service Complex (MSC) Building 1235, and a new Proof Load Test Pit (PLTP)

  • Location: F.E. Warren AFB, WY
  • Cost: $ 5,323,000
  • Owner: USACE Omaha District
  • Designer: Tetra Tech
  • Construction Period: 04/2010 - 09/2011

[Read more…]

Squad Ops / Aerial Port

squadOpnewConstruct 14,200 SF building for the C-130 Aerial Port Training, including a bridge crane and a 60′ high parachute tower.  Remodel and add to Building No. 1500, Hangar No. 559, for a 24,000 SF ARNG AASF Flight Operations facility and construct a separate  flight support and operations facility.

 

  • Location: Gowen Field, ID
  • Cost: $ 5,537,000
  • Owner: Department of the Air Force
  • Designer: ZQA Architects
  • Construction Period: 02/1998 - 12/1999

 

Design-Build Military Housing Projects

familyHousingnew

RSCI and Tetra Tech AE (formerly WJA) have collaborated since 1998 to design-build/construct  enlisted personnel dormitories at Offutt, Buckley, and Peterson Air Force Bases; and  three dormitories, 46 units of family housing, and a 35-suite Temporary Lodging Facility at Mountain Home AFB.

.

  • Location: Mountain Home, Offutt, Peterson and Buckley AFB
  • Cost: $ 5,000,000 to 12,000,000
  • Owner: USACE
  • Designer: Tetra Tech (WJA)
  • Construction Period: 1995 -2008

[Read more…]

Munitions Assembly and Storage Igloos

munitionsnew

Design-build  three  munitions bunkers with significant earth fill requirements,  administration facility, and munitions assembly facility.

  • Location: Whitman AFB
  • Cost: $ 10,900,000
  • Owner: USACE - Kansas City District
  • Designer: WJA
  • Construction Period: 10/2001-6/2003