Radar Approach Control Facility (RAPCON)

20071206 Bldg 261-Base Ops- 005 croppedConstruct 19,000 SF Radar Approach Control Base Operations Facility and 2,500 SF Runway Lighting Control Building, and  abate and demolish  three existing buildings.   The new Base Operations building serves as the gateway to MHAFB from the flight line for VIP visitors.

  • Location: Mountian Home AFB, ID
  • Cost: 8,469,000
  • Owner: USACE - Seattle District
  • Designer: USACE
  • Construction Period: 03/2006-10/2007