ADAL Bldgs 295, 578 & 584

Design-Build addition and alteration to Bldg 295, renovate  Bldg 584, add Protective Canopy  to Bldg 584 and convert  Bldg 578 to specialized storage.

  • Location: Hill AFB, UT
  • Cost: $ 4,412,000
  • Owner: USACE - Sacramento District
  • Designer: WJA
  • Construction Period: 02/2009 - 05/2010