Blue Creek Bay Bridge

BLue Creek #3Rehabilitate bridge substructure and superstructure. Paint/coat both the substructure towers extending below the and waterline and the superstructure girders. Install 2,900 cathodic protection anodes to prevent structural erosion below water. Replace 15 girder pins and hangers, and 5 abutment bearing assemblies on the east end of the west bound lanes. Demolish the bridge deck, replace expansion joints and place new overlay.

  • Location: Kootenai County, ID
  • Cost: 10,853,491
  • Owner: ITD
  • Designer: ITD
  • Construction Period: 04/2018 - 09/2019