Blue Lakes Trout Hatchery Water Supply Pipeline Replacement

Construct new concrete water intake structure on Alpheus Creek and concrete discharge structure at the Blue Lakes Fish Farm, install 1840 foot (±) 60” HDPE pipeline (200 cfs), fittings, screens, safety devices and equipment, roads and civil site work.

  • Location: Twin Falls, ID
  • Cost: $1,000,000
  • Owner: Blue Lakes Fish Farm
  • Designer: MWH Engineers
  • Construction Period: 04/2013 - 10/2013