Design-Build RPA Weapons School

RPA Completion Ryan White PhotographyConstruct a LEED Silver, two‐story, 40,534 sf facility and associated site improvements including pervious and conventional paving and circulation areas, concrete sidewalks, and landscaping.

  • Location: Undisclosed
  • Cost: 15,132,272
  • Owner: USACE
  • Designer: WJA Design Collaborative
  • Construction Period: 08/2014 - 07/2016