Design-Build Selenium Treatment System Phases I & II

Smoky 1Phase I – Construct a 250gpm pilot treatment system (expandable to 2,000 gpm) utilizing a fluidized bed reactor high rate biological reduction process and an ultra-filtration reverse osmosis (UF/RO) pretreatment system to remove selenium to a rate of -0.005mg/L from South Fork Sage Creek and Hoopes Springs.

Phase II – Supply, deliver, and install  a 2,000-GPM “turnkey” supplied UF/RO Selenium  Treatment System.  Project includes  concrete, mechanical, HVAC, ventilation for Frontier Bioreactors, electrical, and instrumentation and controls.

  • Location: Smoky Canyon Mine, Afton, WY
  • Cost: 15,362,020
  • Owner: JR Simplot Company
  • Designer: Stantec
  • Construction Period: 02/2014 - 12/2017