Manning Crevice Bridge Replacement

Manning 02Manning CreviceCM/GC project to replace a 300’+ span double tower cable-stayed, suspension, vehicular bridge over the Salmon river with a single tower cable-stayed, suspension bridge.

 

  • Location: Riggins, ID
  • Cost: 9,640,000
  • Owner: WFHL
  • Designer: Atkins
  • Construction Period: 06/14 - 05/18