Process Water Treatment & Return Plant Phase I & II

20140414 Final Completion 2Phase I – Install concrete including building, tanks, footings, walls, slabs, equipment pads, sidewalks, and exterior pads, mechanical process piping and plumbing and supply  two metal buildings. Phase II – Install plumbing, process mechanical equipment, process piping, valves and fittings for the Blancher Surge, Primary Clarifier Scum Overflow, Centrifuge Building  and Screen Building Systems.

  • Location: Caldwell, ID
  • Cost: 6,086,000
  • Owner: Private
  • Designer: CDM Constructors, inc
  • Construction Period: 06/2012 – 06/2014