Rail Transfer Facility

railTransfer_new

Construct a  pre-engineered metal building rail transfer facility for US Ecology of Idaho, install equipment, HVAC, air distribution systems, various structural concrete work, electrical, communications, truck scale, and coordinate with new railroad spur.

  • Location: Grandview, ID
  • Cost: $ 1,552,000
  • Owner: US Ecology of Idaho
  • Designer: Case, Lowe and Hart, Inc.
  • Construction Period: 12/2005 - 05/2006