Twin Falls WWTP Improvements

Twin Falls 01Construct new 16mgd Integrated Fixed-Film Activated Sludge (IFAS) treatment facility including new aeration basin, turbo blowers with building, secondary clarifier, RAS pump station, backup generator, and site improvements and demolition.  Modify the existing RAS, four (4) existing aeration basins, UV disinfection facility, and plant water pump system.

  • Location: Twin Falls, ID
  • Cost: 18,599,216
  • Owner: City of Twin Falls
  • Designer: CH2MHill
  • Construction Period: 06/2014 - 05/2016