Big Sky WRRF Improvements – Phase 1
- Location: Big Sky, Montana
- Cost: $41 Million
- Owner: Big Sky County Water & Sewer District No. 363
- Designer: AE2S
- Beginning of Construction: 04/2021
- Construction Completed: 07/2023
- Construct new Headworks and Membrane Bioreactor (MBR) buildings and treatment process basins. Convert one existing Sequencing Batch Reactor (SBR) basin into two Anerobic Digesters, and one SBR tank into a flow equalization tank. Install mechanical including plumbing, process and site piping, equipment installation, HVAC, and fire protection; and electrical including new MCC, backup generator, SCADA instrumentation, and controls. Site-civil work includes yard pipe, landscaping, and a soldier pile engineered retaining wall.