South Valley WRF Project 5
Construct a new multi-level grit removal building, including grit removal basins, grit pumping facilities, grit washing, conveying equipment and yard piping.
South Valley WRF Project 5 Read More »
completed
Construct a new multi-level grit removal building, including grit removal basins, grit pumping facilities, grit washing, conveying equipment and yard piping.
South Valley WRF Project 5 Read More »
New 2MGD WTF for a raw food processing plant, includes a 580-foot x 290-foot concrete Covered Anaerobic Lagoon, Aerobic Basin, Secondary Clarifier, and Headworks, Blower and Biogas Buildings.
Industrial Food Plant WWTP Read More »
Replace the existing single lane, tri-span Williams Creek (Shoup) Bridge with an updated dual lane, single span structure utilizing an arched steel and suspension cable support system.
Williams Creek (Shoup) Bridge Replacement Read More »
Raise embankments, and construct a new interior drainage pump station and gatewell capable of discharging 280,000 GPM.
Devils Lake Flood Risk Management Phase 2B Embankments Read More »
Two new bridges over the St. Joe River and St. Maries River Railroad.
Design-Build SH-3 St. Joe River & St Maries RR Bridge Read More »
New administrative facility with vehicle storage, maintenance area, and residential units.
Teton County Parks and Recreation Maintenance / Housing Project Read More »
The 42,400 SF Red Flag 5th Generation Addition provides operational training facilities to support large scale air combat exercises.
Design-Build Red Flag 5th Generation Facility Read More »
Design-build a 50,967 SF administrative and training facility with simulators, auditorium, conference and training rooms, and instructors’ offices.
Design-Build Joint Simulation Environment Facility Read More »
Construct Solids Handling and expand the Administration buildings, demolish and replace the entire mechanical and electrical systems.
Wawona WWTP, Yosemite National Park Read More »
Construct two new high-rate clarifiers with vacuum blowers, two new media filters, a new UV disinfection system, install high service pumps, piping, and valves.
Lockwood WTP Upgrades Read More »