Design-Build RPA Weapons School

RPA Completion Ryan White PhotographyConstruct a LEED Silver, two‐story, 40,534 sf facility and associated site improvements including pervious and conventional paving and circulation areas, concrete sidewalks, and landscaping.

  • Cost: $15,132,272
  • Owner: USACE
  • Designer: WJA Design Collaborative
  • Construction Period: 08/2014 - 07/2016

Radar Approach Control Facility (RAPCON)

20071206 Bldg 261-Base Ops- 005 croppedConstruct 19,000 SF Radar Approach Control Base Operations Facility and 2,500 SF Runway Lighting Control Building, and  abate and demolish  three existing buildings.   The new Base Operations building serves as the gateway to MHAFB from the flight line for VIP visitors.

  • Cost: $8,469,000
  • Owner: USACE - Seattle District
  • Designer: USACE
  • Construction Period: 03/2006-10/2007

Design-Build 130H Simulator Training Operations

EC130 Final CompletionDesign and construct a new 50,000 sf Simulator Training Facility including site work, demolition, steel building, masonry, finishes, mechanical and electrical systems.

 

  • Cost: $14,942,344
  • Owner: USACE Los Angeles District
  • Designer: Tetra Tech AE / WJA
  • Construction Period: 09/2012 – 07/2014

Design-Build WSA Upgrade Phase 2

Design and construct three earth-covered precast concrete munitions storage modules,  a one-half munitions storage module, a new CMU munitions maintenance and handling facility and a munitions holding pad.

  • Cost: $9,475,000
  • Owner: USACE
  • Designer: Tetra Tech / WJA
  • Construction Period: 11/2012 – 11/2014

ADAL Fitness Center

rsci mhafb subject b 12_9_05 007

Construct an addition and remodel the interior and exterior of the existing fitness center to deliver a new 82,000sf facility.  This contract also includes a design-build change order to construct a roof overbuild system for the existing gymnasiums and natatorium and add a de-humidification system for the existing natatorium.

 

  • Cost: $9,100,000
  • Owner: USACE - Mountain Home AFB
  • Designer: WJA
  • Construction Period: 03/2004-11/2005

Diesel Shoppette

websienewe

Modify exist gas station to incorporate diesel fuel, install new fueling system, remove and replace existing canopy.

 

  • Cost: $460,000
  • Owner: Army & Air Force Exchange Service
  • Designer: Morris & Associates
  • Construction Period: 09/2007-12/2007

Munitions Assembly and Storage Igloos

munitionsnew

Design-build  three  munitions bunkers with significant earth fill requirements,  administration facility, and munitions assembly facility.

 

  • Cost: $10,900,000
  • Owner: USACE - Kansas City District
  • Designer: WJA
  • Construction Period: 10/2001-6/2003

Design-Build Military Housing Projects

familyHousingnew

RSCI and  WJA-dc have collaborated since 1998 to design-build/construct  enlisted personnel dormitories at Offutt, Buckley, and Peterson Air Force Bases; along with  three dormitories, 46 units of family housing, and a 35-suite Temporary Lodging Facility at Mountain Home Air Force Base.

  • Cost: $5,000,000 to $12,000,000
  • Owner: USACE
  • Designer: WJA-dc
  • Construction Period: 1995 -2008

Enhanced Training in Idaho Bombing Range

trainingRangenew

Design-Build expansion of Saylor Creek fighter/bomber training range, 43.5 miles of roadway improvement, 52 pre-engineered metal buildings, radar emitter sites, industrial complex, maintenance facility, multi target and revetment disposition, remote job site location requiring man camp facility, aggressive 289 day design-build schedule, environmentally sensitive areas with “no work” constraints during certain dates. (Joint Venture with CH2M HILL)

 

  • Cost: $17,784,000
  • Owner: USACE - Mountain Home AFB
  • Designer: WJA
  • Construction Period: 03/2000 - 12/2001

Temporary Lodging Facility TLF

Extview from Left final

Construct a 55,000sf wood frame suite-style lodging facility with  35 one-and two-bedroom units (each with a kitchen and full bath) and install utilities, roadways, parking lot, playground and landscaping.

  • Cost: $12,400,000
  • Owner: USACE Seattle District
  • Designer: WJA
  • Construction Period: 08/2007 to 01/2009