Design-Build addition and alteration to Bldg 295, renovate Bldg 584, add Protective Canopy to Bldg 584 and convert Bldg 578 to specialized storage.
- Cost: $4,412,000
- Owner: USACE - Sacramento District
- Designer: WJA
- Construction Period: 02/2009 - 05/2010