Blackfoot WWTP Improvements

Upgrade the existing wastewater treatment plant while maintaining complete plant operations. Construct new interceptor (that includes 58-inch boring under Interstate 15), new Headworks Building and UV Building, repair existing anaerobic digester, improve existing aeration system, retrofit existing secondary clarifier, demolish existing sewer systems and piping, work includes bypass pumping, site improvements, yard piping, electrical, controls & instrumentation.

  • Location: Blackfoot, Idaho
  • Cost: $14,050,780
  • Owner: City of Blackfoot
  • Designer: JUB Engineers
  • Construction Period: 11/2019 - 05/2021