Rehabilitate a 565’ pre-stressed, pre-cast, concrete-panel bridge with 22 individual spans, concrete abutments and 21 steel bents.
- Cost: $1,320,383
- Owner: Idaho Power Company
- Designer: JUB
- Construction Period: 03/2014 – 07/2014
Rehabilitate a 565’ pre-stressed, pre-cast, concrete-panel bridge with 22 individual spans, concrete abutments and 21 steel bents.