Design-Build Joint Simulation Facility

50,967 SF facility includes reinforced concrete foundation and floor slab, structural steel frames, split-face masonry unit walls, standing metal seam roofing system, fire detection and protection system,   communication, utilities, pavements and site work.

  • Location: Nevada
  • Cost: $27,554,000
  • Owner: USACE
  • Designer: WJA-dc
  • Construction Period: 06/2020 - 06/2022