Design-Build Mission and Flight Simulator Training Facility

Design and construct a 52,000 SF facility to include open three-story simulator bays, along with site utilities, concrete pavement, site improvements, and landscaping.

 

  • Cost: $24,633,000
  • Owner: USACE Tulsa District
  • Designer: WJA - dc
  • Construction Period: 03/2019 - 03/2021