Design-Build Red Flag 5th Generation Facility

Design and construct a 42,000 SF addition  to accommodate the facility mission.

  • Cost: $21,623,000
  • Owner: USACE Los Angeles District
  • Designer: WJA Design Collaborative
  • Construction Period: 07/2019 - 02/2022