Construct three new concrete aeration basins and clarifiers, two scum skimmers, influent splitter box, effluent weir, and power/controls, install two pre-purchased collector mechanisms and owner supplied aeration piping, clarifier equipment, gates, valves, wiring, and controls.
- Cost: $1,726,000
- Owner: City of Emmett
- Designer: Brown and Caldwell
- Construction Period: 07/2013 - 02/2014