New WWTP including influent lift station, screening, biological treatment, membrane bioreactors (MBR), UV disinfection, biosolids and dewatering, laboratory, site work, and related items.
- Cost: $10,545,000
- Owner: City of Filer
- Designer: JUB Engineers
- Construction Period: 03/2010 - 09/2011