Fort Peck Water Treatment Facility

Construct new treatment plant process building which houses 8 cast in place concrete filter boxes, a single-level chemical feed and storage area, electrical load center, operations & administration area, garage/shop maintenance area, 30-foot deep drain pump station, along with associated access roads, sitework, and landscaping irrigation water system, potable water system, sanitary sewer system, equipment installation, plumbing, instrumentation & controls, heating & ventilation, and electrical.

  • Cost: $27,287,000
  • Owner: Fort Peck Assiniboine and Sioux Tribes
  • Designer: Morrison - Maierle, Inc
  • Construction Period: 06/2009 - 12/2011