Hawthorne Groundwater Treatment System

DSCN0641_066

Construct a groundwater treatment system capable of treating arsenic and fluoride, including water supply treatment building, plant/utilities building,  concrete clearwell, water filtration and chemical injection equipment, cooling tower, potable water storage tank, two  500,000 gallon water tanks,  building information systems,  site utilities,  roads,  raw water lines,  booster pump station,  yard pipe  and waterline replacements.

  • Cost: $8,700,000
  • Owner: USACE - Sacramento District
  • Designer: USACE - Sacramento District
  • Construction Period: 05/2008 - 05/2010