Industrial Food Plant WWTP

Construct new two-million gallon per day (MGD) water treatment facility for a raw food processing plant. Structures include a 580-foot x 290-foot concrete Covered Anerobic Lagoon (CAL),  an Aerobic Basin, Secondary Clarifier, Headworks/Screening Building, Blower Building, and Biogas Building.

  • Location: Othello, Washington
  • Cost: $33,500,000
  • Owner: Private Owner
  • Designer: The Stover Group
  • Construction Period: 02/2020 - 03/2021