Construct CMU building, install process piping, yard pipe, plumbing, HVAC, electrical, instrumentation, and three owner supplied filter packages (cloth media type filters in steel tanks).
- Cost: $1,310,800
- Owner: City of Ketchum
- Designer: Pharmer Engineering, LLC
- Construction Period: 05/2006 - 12/2006