Ketchum WWTF Filter Storage Building

335 - 20070309 Substantial Completion 001Construct  CMU building, install process piping, yard pipe, plumbing, HVAC, electrical, instrumentation, and three owner supplied filter packages (cloth media type filters in steel tanks).

 

  • Cost: $1,310,800
  • Owner: City of Ketchum
  • Designer: Pharmer Engineering, LLC
  • Construction Period: 05/2006 - 12/2006