Lockwood WTP Upgrades

Demolish select piping, valves, pumps, blowers and miscellaneous items within the existing water treatment plant and site. Expand associated CMU building with metal siding and roof. Construct two new high-rate clarifiers with vacuum blowers, two new media filters, a new UV disinfection system, new high service pumps and associated piping, valves, cast in place basins, walkways and stairs, instrumentation and controls.

  • Location: Billings, Montana
  • Cost: $7 Mil
  • Owner: Lockwood Water and Sewer District
  • Designer: Morrison Maierle
  • Construction Period: 04/21 – 03/22