Multipurpose Range Complex Repair

Repair two adjacent military training ranges, Range 1 and Range 36, repair existing target emplacements by replacing existing railroad tie retaining walls with new precast concrete coffins and concrete block retaining walls. Repair 15 KV power distribution systems, 240-volt systems and target controls. Construct new storm water drainage swales and reseed all disturbed areas.

  • Location: Orchard, Idaho
  • Cost: $22,000,000
  • Owner: State of Idaho Military Division
  • Designer: Farren Engineering
  • Construction Period: 01/2020 - 06/2021