NW Interceptor Portion B Paradise Lift Station Construct Paradise Lift Station including structure, concrete, equipment, process piping and plumbing. Cost: $1,566,000 Owner: City of Chubbuck Designer: J.U.B. Engineers Construction Period: 04/2010 - 11/2011