NW Interceptor Portion B Paradise Lift Station

100_0611bUILDING CROPPED

Construct Paradise Lift Station including structure, concrete, equipment, process piping and plumbing.

 

  • Cost: $1,566,000
  • Owner: City of Chubbuck
  • Designer: J.U.B. Engineers
  • Construction Period: 04/2010 - 11/2011