Oxbow Wastewater Treatment Facility

371 Final cropped reduced file

Construct headworks building, primary lift station, membrane bioreactor (MBR) building with equipment and basins, process and scour air blower facilities, non potable water booster pump station, ultraviolet light disinfection, solids dewatering building comprised of a belt filter press and load out area sized for 2 MGD expandable to 8 MGD, maintenance building, administration building, a reuse water wet well for a future Class A reuse, wastewater pump station, and a standalone 2000KW standby power generation facility.

  • Cost: $20,612,000
  • Owner: EIRWWA
  • Designer: Forsgren Associates, Inc
  • Construction Period: 07/2008 - 01/2010