Post Falls Wastewater Treatment Plant Improvements

20010410378 entire plant resized

Construct oxidation ditches No. 5 and No. 6, clarifiers No. 6 and No. 7, expand existing dewatering and headworks buildings with an additional belt filter press biological nutrient removal, fine screen, grit chamber, and odor control. Provide all appurtenant piping, pumps, electrical, and site modification.
  • Cost: $11,246,000
  • Owner: City of Post Falls
  • Designer: J.U.B. Engineers
  • Construction Period: 03/2009 - 07/2010