Construct a 2-million gallon, cast-in-place concrete, earthen-covered, treated water storage tank, install yard piping, overflow structure, precast control building with chlorination system and transmission main line leading up to the tank structure.
- Cost: $2,679,695
- Owner: City of Hailey
- Designer: Carollo Engineers
- Construction Period: 06/2006 - 06/2007