Rehabilitate Mores Creek Bridge

Rehabilitate Pier 4 footing (including pressure grouting and rock armoring), expansion joint and bridge deck, install guardrail,  bridge railing,  seismic restrainers, bearing cap extension, and paint steel truss superstructure.

 

  • Cost: 3,200,000
  • Owner: ITD
  • Designer: HDR
  • Construction Period: 10/2011 - 11/2011