SH-3 St Joe River & St Maries RR Bridges

St MariesReplace existing bridges with new structures to meet current loading criteria, geometric standards, as well as pedestrian and ADA requirements. Work includes roadway reconstruction and shoulder widening at the north and south ends of the bridges, along with driveway and approach work, to provide proper tie-in and modifications to the Railroad Ave ramp.

  • Location: St. Maries, ID
  • Cost: 17,315,800
  • Owner: Idaho Transportation Department
  • Designer: J-U-B
  • Construction Period: 07/2017 - 06/2019