Star Wastewater Treatment Plant

starWastenewImprove the existing wastewater lagoon treatment facility, construct new membrane bioreactor (MBR) mechanical wastewater treatment process with cast-in-place concrete basins, blower building, headworks building with screenwash system, and  UV disinfection facility, install displacement blowers, permeate pumps, WAS pumps, mechanical piping and electrical systems.

 

  • Cost: $3,245,000
  • Owner: Star Sewer & Water District
  • Designer: Keller Associates
  • Construction Period: 02/2005 - 02/2006