Tank 1B Improvements

Construct a two-million-gallon prestressed concrete water storage reservoir, overflow pond, and site improvements, and connect the reservoir to the existing water distribution system. Project includes significant blasting and rock removal.

  • Cost: $3,172,700
  • Owner: City of Mountain Home
  • Designer: Keller Associates
  • Construction Period: 09/2018 - 05/2019