Teton Valley Regional WWTP

Teton Aeration testExpand and remodel existing headworks building, and public works shop building.  Construct  new laboratory, office space,  primary lift station, operations building, MSABP biological treatment system, flash mix, flocculation and plate settler basins, drain lift station, and  disc filter UV disinfection building, install new screen and washpactor equipment, associated yard piping, landscaping, electrical and controls.

 

  • Cost: $5,070,000
  • Owner: City of Driggs
  • Designer: Aqua Engineering
  • Construction Period: 07/2012 – 11/2013