Construct new filtrate tanks, improve and modify dewatering building, site work, yard piping, and process instrumentation and control system including MCC and distribution system reroute.
- Cost: $2,704,000
- Owner: City of Boise
- Designer: MWH Engineering
- Construction Period: 11/2005 - 08/2006