WWTP Filter Building

DCIM112MEDIAMAX_0022.JPGConstruct a  tertiary gravity filter (i.e. Filter Building),  Secondary Effluent Pump Station,  Utility Water/Backwash Pump Station, and associated improvements at the Caldwell Wastewater Treatment Plant.

  • Location: Caldwell, ID
  • Cost: 12,248,892
  • Owner: City of Caldwell
  • Designer: Bowen & Collins Associates
  • Construction Period: 12/2017 - 11/2019