SH-3 St. Joe River & St Maries RR Bridge
- Location: St. Maries, Idaho
- Cost: $7.5 Million
- Owner: Idaho Power
- Designer: CH2MHill
- Beginning of Construction: 06/2017
- Construction Completed: 05/2018
- Construct a pile and lag wall system, concrete fish ladder with transport channel, viewing vault, auxiliary water system (AWS), and install equipment.