WRF Influent Lift Station
- Location: Billings, Montana
- Cost: $5 Million
- Owner: City of Billings
- Designer: HDR Engineering
- Beginning of Construction: 03/2021
- Construction Completed: 11/2021
- Construct a new wastewater influent lift station with screw pumps, site work includes 60-inch and 48-inch interceptors, 30-inch, 24-inch and 8-inch stormwater piping and associated structures, electrical and controls.