Pocatello WPCF Phase I Improvements

DCIM104MEDIAMAX_0023.JPGModify existing aeration basins providing new aeration piping, gates, instrumentation, airflow meters, mixers, and valves; Construct a new mixed liquor recycled pumping station; Modify existing control structure at the Biosolids Storage Lagoon; Modify the existing Disinfection Building into a new Chemical Building; Construct new UV Disinfection Building and Filtration Building; InstallĀ  Owner-furnished fine screens, washer compactor, and ultraviolet disinfection equipment; Perform all associated yard piping, civil, structural, mechanical, plumbing, electrical and instrumentation work.

  • Location: Pocatello, ID
  • Cost: 19,594,963
  • Owner: City of Pocatello
  • Designer: HDR
  • Construction Period: 06/2015 - 02/2017