Design-Build Missile Procedure Training Facility

Design-Build  LEED Gold certified Missile Procedures Training Operations Facility to manage and direct missile operations includes briefing rooms, simulators, warehouse areas and non-food storage.

Read More

Devil’s Lake Embankments Phase 2B / East Ditch Pump Station

Raise 13,000 LFof embankments along Devil's Lake from elevation 1461.2 to 1468.2. Construct a new interior drainage pump station/gatewell and remove and demo the existing pump station. Pump station consists of structural headwall with 72” diameter inlet piping capable of discharging 280,000 GPM through eight 42” HDPE discharge lines connected…

Read More

Fall Creek Fish Facility

Construct a new adult fish collection facility, upgrade and tie in to the existing fish facility to comply with current environmental criteria, and provide a safe working environment for the end user. This effort includes a new concrete fish ladder, pre-sort structure, fish crowder, transport flumes, anesthetic tank, recovery tank,…

Read More

Fort Peck Water Treatment Facility

Construct new treatment plant process building which houses 8 cast in place concrete filter boxes, a single-level chemical feed and storage area, electrical load center, operations & administration area, garage/shop maintenance area, 30-foot deep drain pump station, along with associated access roads, sitework, and landscaping irrigation water system, potable water…

Read More

Manning Crevice Bridge Replacement

CM/GC project to replace a 300’+ span double tower cable-stayed, suspension, vehicular bridge over the Salmon river with a single tower cable-stayed, suspension bridge.  

Read More

Minidoka Dam Modifications

Construct a south gated spillway,  north and south mass concrete dikes, north and south side canal headworks, north and south mass concrete overflow spillways, and modify the existing north gated spillway.  The spillway dike is 2,000 feet long, the 3 radial gate structures contain 16 radial gates each 20’ wide…

Read More

Rehabilitate Mores Creek Bridge

Rehabilitate Pier 4 footing (including pressure grouting and rock armoring), expansion joint and bridge deck, install guardrail,  bridge railing,  seismic restrainers, bearing cap extension, and paint steel truss superstructure.  

Read More

Completed Projects

RSCI has completed major projects for a variety of industries including Commercial, Infrastructure, Water Treatment and Government projects. You can view our list of completed projects here:

View Projects

Current Projects

RSCI is currently working on a variety of different projects including Commercial, Infrastructure, Water Treatment and Government projects. You can view our list of current projects here:

View Projects

Bidding

RSCI Bidding / Estimating Team RSCI has adapted electronic bidding to connect with subcontractors

Read More