Upper Malad Fish Ladder

Upper MaladConstruct a pile and lag wall system, concrete fish ladder with transport channel, viewing vault, auxiliary water system (AWS) and install equipment .

  • Location: Hagerman, ID
  • Cost: 3,850,000
  • Owner: Idaho Power
  • Designer: CH2MHill
  • Construction Period: 06/2017 - 05/2018