WRF Influent Lift Station

Construct a new wastewater influent lift station with screw pumps, site work includes 60-inch and 48-inch interceptors, 30-inch, 24-inch and 8-inch stormwater piping and associated structures, electrical and controls.

 

  • Location: Billings, Montana
  • Cost: $5 Mil
  • Owner: City of Billings
  • Designer: HDR Engineering
  • Construction Period: 03/21 – 11/21